City of PasadenaSame price statewide

Prefab ADUs in Pasadena

Pasadena waives its residential impact fee on ADUs up to 900 sq ft and halves plan-check fees — and rents here are up 31% since 2021. We deliver an all-in prefab ADU from our factory in Lathrop — permits, foundation, delivery and installation included — at one fixed price.

222ADU permits in Pasadena in 2025ADU permits, 2025
931ADU permits in Pasadena from 2021 to 2025ADUs since 2021
$3,022average asking rent in Pasadena, Aug 2026avg rent / mo

Free lot check · zoning, setbacks, utilities · reply with a fixed price

Licensed builder · Our own factory in Lathrop, CA

Real homes we build, start to finish

Large Studio ADU with deck in a landscaped backyar
Bright ADU living room
Kitchen with full-size appliances
ADU bedroom with garden view
Walk-in shower and vanity
Accessible bathroom
Large Studio ADU with dark cladding
Small Studio with wood cladding
Backyard Studio exterior
1 Bedroom ADU exterior
Studio with hanging chair on the porch
2 Bedroom ADU exterior

Quick answer

ADUs in Pasadena — key facts for 2026

Most Pasadena homeowners can add a detached ADU — 800 sq ft is always allowed, up to 1,200 sq ft under local standards — with no Residential Impact Fee up to 900 sq ft and no parking near transit. Bay Modular delivers a factory-built ADU all-in for $124,900–$271,900 — the same price anywhere in California.

Can I build an ADU in Pasadena?
Yes, on most lots with a single-family home. A detached ADU of up to 800 sq ft and 16 ft with 4-ft side and rear setbacks is always allowed; larger ADUs up to 1,200 sq ft follow local standards.
How long does a Pasadena ADU permit take?
ADUs are approved ministerially through the City's permit portal; state law requires a decision within 60 days of a complete application.
What fees does Pasadena charge?
No Residential Impact Fee for ADUs up to 900 sq ft, plus a 50% plan-check discount and reduced permit taxes on single-family sites. School fees apply only over 500 sq ft.
How much does a prefab ADU cost in Pasadena?
Bay Modular: $124,900–$271,900 all-in, the same price as anywhere in California, permits and installation included.
How many ADUs does Pasadena build?
222 ADU permits in 2025 and 931 from 2021 to 2025.
What does an ADU rent for in Pasadena?
Average asking rent in Pasadena was $3,022 a month in August 2026 (Zillow), up 31% since January 2021.

Sources: HCD APR 2025, Pasadena Ordinance No. 7420 (May 2024) and the City’s ADU page, Zillow ZORI Aug 2026. Last reviewed October 2026.

Pasadena in numbers

Pasadena keeps building ADUs

Pasadena issued 931 ADU permits from 2021 to 2025 — about 200 a year since 2022, and 222 in 2025.

ADU permits issued in the City of Pasadena

11227.1% of all homes2021
21379.8% of all homes2022
17662.2% of all homes2023
20840.3% of all homes2024
22231.8% of all homes2025

Source: California HCD Annual Progress Report data (Table A2), City of Pasadena, permits issued per year. Percent = ADUs among all housing units permitted in the city that year.

+31%

average Pasadena asking rent since January 2021 ($2,308 → $3,022)

Zillow Observed Rent Index, City of Pasadena, Aug 2026
931

ADU permits issued in Pasadena in five years (2021–2025)

HCD APR data, 2021–2025

Can I build in Pasadena?

Most Pasadena lots with a house can add an ADU

Pasadena’s ADU rules (Ordinance No. 7420, in effect since May 20, 2024) follow state law with local details. Here is what matters for most homeowners:

Size

A detached ADU of up to 800 sq ft is always allowed; up to 1,200 sq ft under local standards — all our models fit.

Setbacks & height

4 ft from side and rear lot lines and 16 ft tall for the always-allowed ADU; larger ADUs follow the City's local standards.

Parking

One space — but none within half a mile walking of transit, in historic districts, near car share, or inside existing space. The ADU shares your driveway.

Historic districts

ADUs are allowed in historic districts; a detached one must not be visible from the street.

Fees

No Residential Impact Fee up to 900 sq ft, 50% off plan check and reduced permit taxes on single-family sites.

Rentals

ADUs can't be rented for less than 30 days — plan on long-term tenants.

Based on Pasadena Ordinance No. 7420 and the City’s ADU page. Not legal advice — rules depend on your exact lot. More in our ADU guides.

New in 2027: under AB 956 (Chapter 791, Statutes of 2026), from January 1, 2027 state law lets you build two detached ADUs on a lot with a single-family home, and HOA rules can’t block an ADU on a lot zoned to allow one.

Not sure about your lot?

Send your Pasadena address — we check zoning, historic status, transit distance and utilities for free.

Check my Pasadena lot

Costs & fees in Pasadena

What an ADU costs in Pasadena

Same all-in price as anywhere in California. Our models are all under 750 sq ft, so none pays impact fees — and four of five pay no school fees.

ModelAll-in priceSchool feesCity impact fees
Backyard Studio120 sq ft · home office or guest studio, not a rentable ADU$75,900$0$0
Small Studio256 sq ft$124,900$0$0
Large Studio ADU320 sq ft$154,900$0$0
1 Bedroom ADU480 sq ft$214,900$0$0
2 Bedroom ADU640 sq ft$271,900$3,443$0
No school fees under 500 sq ftOver 500 sq ft, Pasadena Unified charges its school developer fee (up to $5.38 per sq ft in 2026).
No Residential Impact Fee up to 900 sq ftOn single-family sites, ADUs up to 900 sq ft also get 50% off plan check and reduced permit taxes.
Permit & utility feesCity permit fees and utility connections depend on your lot — we include them in your lot-specific quote.
Typical site-built ADUBay Modular
PriceBids that can change with site conditionsOne fixed all-in price
Construction in your yardMonths of framing, noise and crewsAbout a week to install
Permits & plansYou hire a designer and manage the cityHCD-approved plans; we handle the city
Quality controlBuilt outdoors, weather-dependentBuilt indoors in our Lathrop factory

Sources: Gov. Code §66311.5; Ed. Code §17620 and State Allocation Board 2026 school fee maximum; City of Pasadena ADU page (Reduced Fees and Impact Fees, 2025). Launch pricing runs through December 31, 2026. Comparison is general — every project differs.

Renting in Pasadena

Renting out an ADU in Pasadena

$3,022/mo

average asking rent for all homes in Pasadena — up 31% since 2021. HUD's 2027 fair rent for a 2-bedroom in the area is $2,964.

Zillow Observed Rent Index, City of Pasadena, Aug 2026 · HUD FY2027 FMR ADU for rental income
Long-term rentals only

Pasadena ADUs can't be rented for less than 30 days — plan on long-term tenants.

Optional fee agreements

A 7-year Landlord Agreement or affordability covenant can waive more fees — optional, not required for a permit.

State rules

A new ADU is exempt from California's statewide rent cap (AB 1482) for 15 years after its certificate of occupancy.

Same money, other options

Yearly income per dollar, before taxes and costs. An ADU wins because you already own the land. Full comparison →

2 Bedroom ADU at HUD 2-bedroom fair rent13.1%
10-year U.S. Treasury5.3%
REIT index fund dividends3.9%
Buying a rental home, LA metro3.7%
12-month CD, U.S. average1.7%

Sources: Pasadena Ordinance No. 7420 and City ADU page (Housing Agreements); Civil Code §1947.12. Comparison: HUD FY2027 2-bedroom Fair Market Rent, Los Angeles-Long Beach-Glendale area ($2,964) × 12 ÷ $271,900; U.S. Treasury (Oct 6, 2026); FTSE Nareit (Sep 2026); Zillow ZORI ÷ ZHVI, LA metro (Aug 2026); FDIC (Sep 2026). Not legal or investment advice.

Permits in Pasadena

How your Pasadena permit works — we handle it

01

Free lot check

Zoning, historic status, transit distance, sewer and power for your Pasadena address.

02

Plans & submittal

Our HCD-approved plans plus your site plan, filed in the City's CSS Permit Portal; optional virtual pre-meeting with City staff.

03

City review

Ministerial plan check with ADU fee reductions applied; we answer comments.

04

Decision in 60 days

State law requires a decision on a complete ADU application within 60 days. Your ADU is built in our factory meanwhile.

05

Install & move in

Delivered from our Lathrop factory, installed in about a week, inspected, then your Certificate of Occupancy.

Based on the City of Pasadena ADU page, Ordinance No. 7420 and Gov. Code §66317.

Why now

Start your Pasadena ADU with zero risk

Lock in launch pricing, see exactly what you get, and only decide once you have a fixed price for your lot.

LAUNCH PRICING · ENDS DEC 31, 2026

All-in from $75,900 — everything included

  • Backyard Studio (home office)$75,900All-in · fixed in writing
  • Small Studio$124,900All-in · fixed in writing
  • Large Studio ADU$154,900All-in · fixed in writing
  • 1 Bedroom ADU$214,900All-in · fixed in writing
  • 2 Bedroom ADU$271,900All-in · fixed in writing
Reserve my launch price

Zero-risk start

  • Free lot check & quoteNo obligation, no credit card.
  • One fixed all-in priceDesign, permits, delivery and install — one number.
  • HCD-approved plansState approval #1585366, financed and appraised like a home.
  • 2-year warrantyOn materials and workmanship.
See it before you buy

Visit our factory in Lathrop, CA and walk through a finished ADU.

Book a factory tour
1We check your lotZoning, setbacks, easements, sewer and power for your address.
2You get a fixed priceThe right model for your lot and one all-in number — permits included.
3You decideNo pressure. Lock in launch pricing before December 31, 2026.

Pasadena ADU questions

Read our ADU guides, see all of California, or call (209) 214-6845.

Can I build an ADU on my lot in Pasadena?

Most Pasadena lots with a single-family home can add a detached ADU. One of up to 800 sq ft and 16 ft with 4-foot side and rear setbacks is always allowed; larger ADUs up to 1,200 sq ft follow local standards. We check your address for free.

How much does an ADU cost in Pasadena?

Our all-in prices are the same as anywhere in California: from $124,900 for a Small Studio to $271,900 for a 2 Bedroom ADU, with launch pricing through December 31, 2026. No Residential Impact Fee up to 900 sq ft, and school fees only above 500 sq ft.

How long does an ADU permit take in Pasadena?

ADUs are approved ministerially, and state law requires a decision within 60 days of a complete application. Your ADU is built in our factory at the same time, so most projects take 4–6 months from signing to keys.

Do I need parking for an ADU in Pasadena?

One space — but none if you are within half a mile walking of a transit stop, in a historic district, near a car-share location, or converting existing space.

Can I build an ADU in a Pasadena historic district?

Yes. In historic districts a detached ADU is allowed if it isn't visible from the public right-of-way.

Can I rent my Pasadena ADU on Airbnb?

No. Pasadena ADUs can't be rented for less than 30 days.

Can Bay Modular deliver to Pasadena?

Yes. We build in our Lathrop factory and deliver statewide at the same all-in price, including Los Angeles County.

Is an ADU a better investment than a rental property in Pasadena?

For most homeowners with room on their lot, yes: you don't buy land. A 2 Bedroom ADU at HUD's 2027 fair rent for a 2-bedroom in the LA-Long Beach area ($2,964) earns about 13.2% a year on its price before costs, vs. about 3.7% for a typical LA-metro rental home (Zillow, Aug 2026). Not investment advice.

Free · no obligation

Can you build an ADU on your Pasadena lot?

Send your Pasadena address. We'll check zoning, historic status, transit distance and utilities, and send a fixed all-in price — permits included.

HCD-approved plans (#1585366) · 2-year warranty · factory in Lathrop, CA

Sources: California HCD Annual Progress Report data, Table A2 (City of Pasadena, 2021–2025, updated Oct 2026); Zillow Observed Rent Index, City of Pasadena (Aug 2026); HUD FY2027 Fair Market Rents (Los Angeles-Long Beach-Glendale); City of Pasadena Ordinance No. 7420 (2024) and ADU page (fees, parking, historic districts). Prices: Bay Modular, October 2026. Not legal advice.

Building in Pasadena?Check my Pasadena lot