City of San FranciscoSame price statewide

San Francisco ADUs: 60-day permit decision, all-in ADUs from $124,900

San Francisco rents jumped 25% in a year, yet fewer ADUs are being permitted than in 2022. Under the State ADU program a backyard cottage is approved ministerially in 60 days. We deliver it all-in from our factory in Lathrop — permits, foundation, delivery and installation included — at one fixed price.

$4,682average asking rent in San Francisco, Aug 2026avg rent / mo
+25%rent growth in one year — the fastest of our citiesrent growth, 1 yr
60 daysministerial State ADU review — no neighbor appealsState ADU review

Free lot check · zoning, historic status, access · reply with a fixed price

Licensed builder · Our own factory in Lathrop, CA

Real homes we build, start to finish

Large Studio ADU with deck in a landscaped backyar
Bright ADU living room
Kitchen with full-size appliances
ADU bedroom with garden view
Walk-in shower and vanity
Accessible bathroom
Large Studio ADU with dark cladding
Small Studio with wood cladding
Backyard Studio exterior
1 Bedroom ADU exterior
Studio with hanging chair on the porch
2 Bedroom ADU exterior

Quick answer

Yes, you can build: up to 1,000 sq ft, 60-day decision, no neighbor appeals

Most San Francisco homeowners with a backyard can add a detached ADU under the State program: up to 850–1,000 sq ft, approved in 60 days with no neighbor appeals, no impact fees under 750 sq ft — and Bay Modular delivers it all-in for $124,900–$271,900, the same price anywhere in California.

Can I build a backyard ADU in San Francisco?
Yes. Under the State ADU program, a single-family lot can add one detached ADU up to 850 sq ft (1,000 sq ft with 2+ bedrooms), 18 ft tall, 4 ft from side and rear lines.
How long does an SF ADU permit take?
State-program ADUs are reviewed ministerially within 60 days of a complete application — no neighbor notice, discretionary review or appeal.
What fees does San Francisco charge?
No impact fees under 750 sq ft. The SFUSD school fee ($3.79 per sq ft) applies only to ADUs over 500 sq ft.
How much does a prefab ADU cost in San Francisco?
Bay Modular: $124,900–$271,900 all-in, the same price as anywhere in California, permits and installation included.
Is a new SF ADU under rent control?
Units built after June 1979 are exempt from SF rent-increase limits, but SF just-cause eviction rules apply. Local-program ADUs can be rent-controlled.
What does an ADU rent for in San Francisco?
Average asking rent in San Francisco was $4,682 a month in August 2026 (Zillow), up 25% in a year.

Sources: SF Planning ADU page and Director Bulletin No. 3 (June 2026), SF Rent Board, HCD APR 2025, Zillow ZORI Aug 2026. Last reviewed October 2026.

San Francisco in numbers

SF rents rose 25% in a year — while ADU permits fell by half

San Francisco permitted half as many ADUs in 2025 as in 2022 — while rents rose faster than anywhere else in our coverage.

ADU permits issued in the City of San Francisco

32014.4% of all homes2021
34212.0% of all homes2022
2909.5% of all homes2023
23121.5% of all homes2024
1718.7% of all homes2025

Source: California HCD Annual Progress Report data (Table A2), City of San Francisco, permits issued per year. Percent = ADUs among all housing units permitted in the city that year.

+62%

average San Francisco asking rent since January 2021 ($2,895 → $4,682)

Zillow Observed Rent Index, City of San Francisco, Aug 2026
+25%

rent growth in just one year (Aug 2025 $3,739 → Aug 2026 $4,682)

Zillow Observed Rent Index, City of San Francisco

Where San Francisco homeowners add ADUs

Sunset/Parkside169 permitsBayview Hunters Point98 permitsWest of Twin Peaks79 permitsOuter Richmond66 permitsExcelsior62 permitsOceanview/Merced/Ingleside59 permitsOuter Mission59 permits

ADU permits issued on existing single-family and two-unit homes since 2013, by neighborhood — most are conversions. For new-construction ADUs the leaders are Oceanview/Merced/Ingleside, Sunset/Parkside, Bayview, Bernal Heights and West of Twin Peaks. Source: DataSF Building Permits (data as of March 2026).

San Francisco neighborhood rooftops

Can I build in San Francisco?

Most SF backyards qualify — no rear-yard rules, no neighbor appeals

San Francisco offers two ADU programs; for backyard cottages the State program is usually simplest. Here is what matters for most homeowners:

Typical San Francisco homes with bay windows
Typical San Francisco homes — many have a deep backyard behind. Stock photo.
Family with two kids having a picnic in a backyard
Your backyard, put to work. Stock photo.
Size

Up to 850 sq ft for a studio or 1-bedroom, 1,000 sq ft with 2+ bedrooms. All our models fit.

Setbacks & height

4 ft from side and rear lot lines; up to 18 ft tall, plus 2 ft to match the house roof.

No rear-yard rules

State-program ADUs don't need to meet SF's rear-yard or exposure rules — the biggest local hurdle is gone.

How many units

One detached ADU plus one converted ADU and one JADU on a single-family lot.

No neighbor appeals

Ministerial review: no neighbor notice, no discretionary review and no appeal for State ADUs.

Historic homes

On listed historic properties the ADU must meet standards that protect the historic resource. We check first.

Based on SF Planning’s ADU page and Planning Director Bulletin No. 3 (updated June 2026, Gov. Code §66323). Not legal advice — rules depend on your exact lot. More in our San Francisco ADU guide.

New in 2027: under AB 956 (Chapter 791, Statutes of 2026), from January 1, 2027 state law lets you build two detached ADUs on a lot with a single-family home, and HOA rules can’t block an ADU on a lot zoned to allow one.

Not sure about your lot?

Send your San Francisco address — we check zoning, historic status, access and utilities for free.

Check my San Francisco lot

Costs & fees in San Francisco

One fixed price — ADUs from $124,900 — $0 city impact fees under 750 sq ft

Same all-in price as anywhere in California. Our models are all under 750 sq ft, so none pays San Francisco impact fees — and four of five pay no school fee.

ModelAll-in priceSchool feesCity impact fees
Backyard Studio120 sq ft · home office or guest studio, not a rentable ADU$75,900$0$0
Small Studio256 sq ft$124,900$0$0
Large Studio ADU320 sq ft$154,900$0$0
1 Bedroom ADU480 sq ft$214,900$0$0
2 Bedroom ADU640 sq ft$271,900$2,426$0
No school fee up to 500 sq ftAbove that, SFUSD charges $3.79 per sq ft — about $2,400 for our 2 Bedroom.
No impact fees under 750 sq ftAlso exempt on lots with three or fewer existing units. Above that, fees scale with the main house.
Building on site costs moreThe City says a new unit typically costs at least $125,000 in materials and labor, plus ~10% for architects and engineers and 6–9% in city fees. Our price is all-in and fixed.
Typical site-built ADUBay Modular
PriceBids that can change with site conditionsOne fixed all-in price
Construction in your yardMonths of framing, noise and crewsAbout a week to install
Permits & plansYou hire a designer and manage the cityHCD-approved plans; we handle the city
Quality controlBuilt outdoors, weather-dependentBuilt indoors in our Lathrop factory

Sources: SF Planning Director Bulletin No. 3 (June 2026); SF Impact Fee Register (Jan 2026, SFUSD $3.79/sq ft); sf.gov “Get a building permit for an ADU” (Oct 2026); Gov. Code §66311.5. Launch pricing runs through December 31, 2026. Comparison is general — every project differs.

Renting in San Francisco

Rent averages $4,682/mo — no SF rent-increase limits on new ADUs

Living room and kitchen inside a Bay Modular 1 Bedroom ADU$4,682/mo

average asking rent for all homes in San Francisco — up 25% in one year and 62% since 2021.

Zillow Observed Rent Index, City of San Francisco, Aug 2026 ADU for rental income
Long-term rentals only

SF ADUs can't join the short-term rental program; every rental must be longer than 30 days.

Rent rules, plainly

Units built after June 1979 are exempt from SF rent-increase limits, but SF just-cause eviction rules apply. Local-program ADUs can be rent-controlled — we use the State program where possible.

You can sell it separately

Since 2025, SF lets a State detached ADU next to a single-family home become a condo and be sold on its own (Ord. 113-25).

Same money, other options

Yearly income per dollar, before taxes and costs. An ADU wins because you already own the land. Full comparison →

2 Bedroom ADU at HUD 2-bedroom fair rent16.3%
10-year U.S. Treasury5.3%
REIT index fund dividends3.9%
Buying a rental home, SF metro3.6%
12-month CD, U.S. average1.7%

Sources: SF Planning ADU page and Bulletin No. 3; SF Rent Board “Partial exemption for newly constructed units”; SF Ordinance 113-25. Comparison: HUD FY2027 2-bedroom Fair Market Rent, San Francisco area ($3,697) × 12 ÷ $271,900; U.S. Treasury (Oct 6, 2026); FTSE Nareit (Sep 2026); Zillow ZORI ÷ ZHVI, San Francisco metro (Aug 2026); FDIC (Sep 2026). Not legal or investment advice.

Permits in San Francisco

We handle your SF permit — the City must decide within 60 days

01

Free lot check

Zoning, historic status, lot lines, sewer and power for your San Francisco address.

02

Plans & submittal

Our HCD-approved plans plus your site plan, filed under the State ADU program with DBI and Planning.

03

Ministerial review

No neighbor notice, no discretionary review, no appeals. We answer city comments for you.

04

Decision in 60 days

The City must act on a complete State-program application within 60 days. Your ADU is built in our factory meanwhile.

05

Install & move in

Delivered from our Lathrop factory, installed in about a week, inspected, then your Certificate of Occupancy.

Based on SF Planning Director Bulletin No. 3 (June 2026) and the SF Planning ADU page (Oct 2026). Narrow lot with no side access? We confirm how the ADU gets to your backyard during the free lot check.

Why now

Save up to $81,000 — free lot check and a fixed quote before you commit

Lock in launch pricing, see exactly what you get, and only decide once you have a fixed price for your lot.

LAUNCH PRICING · ENDS DEC 31, 2026

All-in from $75,900 — everything included

  • Backyard Studio (home office)$75,900All-in · fixed in writing
  • Small Studio$124,900All-in · fixed in writing
  • Large Studio ADU$154,900All-in · fixed in writing
  • 1 Bedroom ADU$214,900All-in · fixed in writing
  • 2 Bedroom ADU$271,900All-in · fixed in writing
Reserve my launch price

Zero-risk start

  • Free lot check & quoteNo obligation, no credit card.
  • One fixed all-in priceDesign, permits, delivery and install — one number.
  • HCD-approved plansState approval #1585366, financed and appraised like a home.
  • 2-year warrantyOn materials and workmanship.
See it before you buy

Visit our factory in Lathrop, CA and walk through a finished ADU.

Book a factory tour
1We check your lotZoning, historic status, access, sewer and power for your address.
2You get a fixed priceThe right model for your lot and one all-in number — permits included.
3You decideNo pressure. Lock in launch pricing before December 31, 2026.

San Francisco ADU questions, answered

Read the full San Francisco ADU guide, see all of California, or call (209) 214-6845.

Can I build an ADU in my backyard in San Francisco?

Usually yes. Under the State ADU program a single-family lot can add one detached ADU up to 850 sq ft (1,000 sq ft with 2+ bedrooms), 18 ft tall, with 4-foot side and rear setbacks — and SF's rear-yard rules don't apply. We check your address for free.

How much does an ADU cost in San Francisco?

Our all-in prices are the same as anywhere in California: from $124,900 for a Small Studio to $271,900 for a 2 Bedroom ADU, with launch pricing through December 31, 2026. There are no impact fees under 750 sq ft, and the SFUSD school fee applies only above 500 sq ft.

How long does an ADU permit take in San Francisco?

State-program ADUs are reviewed ministerially, with a decision required within 60 days of a complete application and no neighbor appeals. Your ADU is built in our factory at the same time, so most projects take 4–6 months from signing to keys.

Is a new ADU in San Francisco under rent control?

Units first built after June 13, 1979 are exempt from SF's rent-increase limits, but SF just-cause eviction rules apply. ADUs built under SF's Local program can be subject to rent control, so we use the State program where possible.

Can I rent my SF ADU on Airbnb?

No. ADUs are ineligible for San Francisco's short-term rental program; rentals must be longer than 30 days.

Can I sell my ADU separately in San Francisco?

Yes, in many cases. Since 2025 SF allows a State detached ADU next to a single-family home to be converted to a condo and sold (Ordinance 113-25), if the lot has four or fewer units.

Do neighbors get a say?

Not under the State program: there is no neighbor notification, discretionary review or appeal for State ADUs.

Is an ADU a better investment than a rental property in San Francisco?

For most homeowners with a backyard, yes: you don't buy land. A 2 Bedroom ADU at HUD's 2027 fair rent for a 2-bedroom ($3,697) earns about 16.4% a year on its price before costs, vs. about 3.6% for a typical SF-area rental home (Zillow, Aug 2026). Not investment advice.

Free · no obligation

Find out free if your San Francisco lot qualifies

Send your San Francisco address. We'll check zoning, historic status, access and utilities, and send a fixed all-in price — permits included.

HCD-approved plans (#1585366) · 2-year warranty · factory in Lathrop, CA

Sources: California HCD Annual Progress Report data, Table A2 (San Francisco, 2021–2025, updated Oct 2026); Zillow Observed Rent Index, City of San Francisco (Aug 2026); SF Planning ADU page and Planning Director Bulletin No. 3 (June 2026); SF Impact Fee Register (Jan 2026); SF Rent Board; SF Ordinance 113-25; Gov. Code §66311.5, §66323; HCD ADU Handbook (2026). General information, not legal or investment advice. Updated October 2026.

Building in San Francisco?Check my San Francisco lot