How we build your ADU

From backyard to keys in 4–6 months

Six clear steps and one team. We build your home in our factory while the city reviews your permit, up to a year sooner than building on site.

✓ One contract · one fixed price · permits to keys

Why it’s faster

Two tracks at once

Most builders wait for the permit before they start. We build your home in the factory while the city reviews the permit and we prepare the site.

On your lot & at the cityIn our factory
Site & city
Lot check & designPermits in reviewSite prepInstallKeys
Our factory
Built in Lathrop, 90% finished
SigningMonth 2Month 4Keys
Bay Modular4–6 months
Typical on-site build12–18+ months

The 6 steps

What happens, and who does it

You make a few decisions. We do the work, from the permit desk to the crane.

Start with step 1
013 days

Free lot check

Send us your address. We check your lot remotely with aerial maps and the title report, and tell you what fits before you spend anything.

YouSend your address
WeA written feasibility report
  • Which ADU sizes fit your backyard
  • Access for delivery and the crane
  • Local rules that affect your build
02

Design & fixed price

Pick your model and finishes with our designer. Every finish we show is included. You get one all-in price, fixed in writing before you sign.

YouChoose a model and finishes
WeDesign, site plan and an all-in quote
  • Exterior colors, cladding, windows and doors
  • Interior paint, floors, counters and cabinets
  • Custom layouts from our in-house drafters
03

Permits

Your project manager takes the plans through plan check and your city’s permits. Our plans are HCD-approved, so the home itself skips local plan check. The city reviews only the foundation and utility hook-ups.

YouSign the permit forms
WeEvery application, revision and city call
  • HCD-approved, factory-built plans
  • One project manager from start to finish
  • Permit fees are included in the all-in price
04At the same time

Factory build & site prep

While your permit is in review, we build your home in our Lathrop factory. Once the permit is issued, we pour the foundation and run the utilities on your lot.

YouNothing. Visit the factory if you’d like.
WeThe home, built 90% complete indoors
  • Built indoors, safe from weather delays
  • Foundation and utility trenches on site
  • Each stage inspected before delivery
051 week

Delivery & install

Your home arrives in modules. A crane sets them on the foundation in a day. We fasten them, connect water, sewer and power, and finish the site work.

YouClear the path and plan for crane day
WeDelivery, crane, hook-ups and site work
  • Delivered in a day
  • Installed and connected in about a week
  • Any special utility work is done during site prep
06Move-in day

Final inspection & keys

The city signs off on the final inspection and we walk through the home with you. Then we hand you the keys. Move in, house family or start renting.

YouWalk through the home and get the keys
WeFinal inspection and handover
  • Final city inspection, done by us
  • A walkthrough of every system
  • Warranty and service after you move in

One partner

One team, every trade

No juggling contractors. One contract, one project manager and one price for all of it.

  • Project manager
  • Designer
  • Architect & drafters
  • Engineering
  • Permits & city reviews
  • Factory crew
  • Site prep & foundation
  • Delivery & crane
  • Plumber
  • Electrician
  • Inspections
  • Warranty & service
  • One contract · one price

Questions

Process FAQ

More answers on our FAQ page.

How long does the whole process take?

Four to six months from signing to keys for most projects. Your home is built in our factory while the city reviews your permit, which is why it’s faster than the 12–18 months a typical on-site build takes. We’ll give you your city’s real timeline before you sign.

What does the free lot check include?

We use your address, aerial maps and the title report to check which ADU sizes fit, how we’ll get the home and the crane in, and which local rules apply. It takes about three days and costs nothing.

Do I need my own architect or contractor?

No. Design, engineering, permits, the factory build, site prep, delivery, utility hook-ups and the final inspection are all handled by our team under one contract.

Will the price change after I sign?

No. You get one all-in price, fixed in writing before you sign. It covers the home, the finishes you pick from our included options, permits, the foundation, delivery, the crane and the hook-ups.

What do I need to do on installation day?

Make sure the delivery path is clear and that you or someone you trust is reachable. The crane sets the modules in a day, and we finish connecting everything over about a week.

Step 1 is free

Find out what fits your backyard

Send your address and get a feasibility report in about three days. No cost and no commitment.

  • Which models fit your lot
  • Access for delivery and the crane
  • Your all-in price and timeline