6 counties around SacramentoSame price statewide

Prefab ADUs in the Sacramento region

The Sacramento region permits close to a thousand ADUs a year, and the City of Sacramento lets you build two on one lot. We deliver an all-in prefab ADU from our Lathrop factory, about an hour south — permits, foundation, delivery and installation included — at one price fixed in writing.

935ADU permits in the Sacramento region in 2025ADU permits, 2025
+78%more ADU permits than in 2021since 2021
$2,282average asking rent, Sacramento metro, Aug 2026avg rent / mo

Free lot check · zoning, fire & hydrant access · reply with a fixed price

Licensed builder · Our own factory in Lathrop, CA

Real homes we build, start to finish

Large Studio ADU with deck in a landscaped backyar
Bright ADU living room
Kitchen with full-size appliances
ADU bedroom with garden view
Walk-in shower and vanity
Accessible bathroom
Large Studio ADU with dark cladding
Small Studio with wood cladding
Backyard Studio exterior
1 Bedroom ADU exterior
Studio with hanging chair on the porch
2 Bedroom ADU exterior

Quick answer

ADUs in the Sacramento region — key facts for 2026

Most homeowners in the Sacramento region can add a detached ADU of at least 800 sq ft under state law, with no city impact fees up to 750 sq ft and no owner-occupancy rule. Bay Modular delivers a factory-built ADU all-in for $124,900–$271,900 — the same price anywhere in California, fixed in writing.

Can I build an ADU in the Sacramento region?
Yes, on most lots with a house. State law guarantees at least an 800 sq ft detached ADU with 4-ft side and rear setbacks in every city and county.
How long does a permit take?
Cities and counties must approve or deny a complete ADU application within 60 days (Gov. Code §66317).
What fees apply?
No city impact fees up to 750 sq ft; school fees only above 500 sq ft. Utility connection fees depend on your lot.
How much does a prefab ADU cost?
Bay Modular: $124,900–$271,900 all-in for a rentable ADU, permits and installation included; $75,900 for a Backyard Studio home office.
How many ADUs does the region build?
935 ADU permits in 2025 across six counties — up 78% from 526 in 2021 (HCD APR).
What does an ADU rent for?
Average asking rent was $2,282 in the Sacramento metro in August 2026 (Zillow); HUD's 2027 fair rent for a 2-bedroom is $2,201.

Sources: HCD APR 2025 (Table A2), HCD ADU Handbook (2026), Zillow ZORI Aug 2026, HUD FY2027 FMR. Last reviewed October 2026.

Sacramento region in numbers

ADU permits in the Sacramento region

Up 78% since 2021 — about 900–1,000 ADU permits a year since 2024.

ADU permits issued in the Sacramento region

5263.7% of all homes2021
7535.8% of all homes2022
8166.2% of all homes2023
1,0187.9% of all homes2024
9357.8% of all homes2025

Source: California HCD Annual Progress Report data (Table A2), Sacramento, Placer, El Dorado, Yolo, Sutter and Yuba counties, permits issued per year. Percent = ADUs among all housing units permitted that year.

+78%

more ADU permits in 2025 than in 2021 (526 → 935)

HCD APR data
4.8%

gross rental yield of an average home in the Sacramento metro — an ADU on land you already own can do better

Zillow ZORI × 12 ÷ ZHVI, Aug 2026

Top cities, 2025

Sacramento401 ADUs

El Dorado County (unincorporated)92 ADUs

Placer County (unincorporated)92 ADUs

Sacramento County (unincorporated)86 ADUs

Davis42 ADUs

HCD APR data, permits issued in 2025

Can I build in the Sacramento region?

Most Sacramento region lots with a house can add an ADU

State law sets minimum rights that every city in the Sacramento region must honor. Here is what applies on most lots:

Size

Every city must allow at least an 800 sq ft detached ADU, whatever its lot-coverage rules (Gov. Code §66321(b)(3)). All our models fit.

Setbacks & height

No more than 4 ft from side and rear lot lines; at least 16 ft of height for a detached ADU, 18 ft near transit (§66314(d)(7), §66321(b)(4)).

Parking

No parking required within ½ mile of transit, and no replacement parking when a garage is removed (§66322).

You don't have to live there

Cities can't require you to live on the property; they may require rentals of 30+ days (§66315).

Fees

No city impact fees for ADUs up to 750 sq ft (§66311.5); school fees apply only above 500 sq ft (Ed. Code §17620).

Decision in 60 days

The city must approve or deny a complete application within 60 days (§66317).

Two ADUs in Sacramento

The City of Sacramento already allows up to two ADUs on one lot — see our Sacramento page for its size rules.

City or county

In unincorporated areas the county (Sacramento, Placer, El Dorado and others) issues the permit under the same state ADU law.

Fire areas

Foothill lots in Placer and El Dorado counties can sit in high fire hazard zones, which adds fire-safety review.

Site plan: a detached ADU behind a single-family homeTop-down plan of a typical lot. The main house sits near the street. A detached ADU in the backyard sits 4 feet from the side and rear property lines; state law guarantees at least 800 square feet.SITE PLAN · STATE LAW MINIMUMSA backyard ADU on a typical lotREAR PROPERTY LINEDetached ADU800 sq ft guaranteed4 ft4 ftMain houseSTREETSetbacks: no more than 4 ft from side and rear lines(Gov. Code §66314(d)(7)). Not to scale.
Height: what state law allows for a detached ADUSide view of a one-story detached ADU. Cities must allow at least 16 feet of height, or 18 feet within half a mile of major transit.SECTION · HEIGHTHow tall it can beOne-story ADU16 ft — every city18 ft near transitGov. Code §66321(b)(4). Not to scale.

Based on the HCD ADU Handbook (2026) and Gov. Code §§66311.5, 66314, 66315, 66317, 66321, 66322. Not legal advice — local standards differ; see our city pages: Sacramento.

New in 2027: under AB 956 (Chapter 791, Statutes of 2026), from January 1, 2027 state law lets you build two detached ADUs on a lot with a single-family home, and HOA rules can’t block an ADU on a lot zoned to allow one.

Not sure about your lot?

Send your address anywhere in the Sacramento region — we check zoning, fire and flood maps, setbacks, access and utilities for free.

Check my lot — free

Costs & fees in the Sacramento region

What an ADU costs in the Sacramento region

Same price as anywhere in California. Every model is 750 sq ft or less, so none pays city impact fees under state law; the only school fee — on the 2 Bedroom ADU — is included in the price.

ModelAll-in priceSchool feeCity impact fee
Backyard Studio120 sq ft · home office or guest studio, not a rentable ADU$75,900$0$0
Small Studio256 sq ft$124,900$0$0
Large Studio ADU320 sq ft$154,900$0$0
1 Bedroom ADU480 sq ft$214,900$0$0
2 Bedroom ADU640 sq ft$271,900Included$0
No city impact fees up to 750 sq ftState law bars impact fees on ADUs this size (Gov. Code §66311.5).
School fees only above 500 sq ftDistricts may charge ADUs over 500 sq ft (Ed. Code §17620) — for our 2 Bedroom ADU it is included in the price.
Permit & utility feesCity permit fees and utility connections depend on your lot — we include them in your lot-specific price.
Typical site-built ADUBay Modular
PriceBids that can change with site conditionsOne fixed all-in price
Construction in your yardMonths of framing, noise and crewsAbout a week to install
Permits & plansYou hire a designer and manage the cityHCD-approved plans; we handle the city
Quality controlBuilt outdoors, weather-dependentBuilt indoors in our Lathrop factory

Sources: Gov. Code §66311.5; Ed. Code §17620. Comparison is general — every project differs.

Renting in the Sacramento region

Renting out an ADU in the Sacramento region

$2,282/mo

average asking rent for all homes in the Sacramento metro. HUD's 2027 fair rent for a 2-bedroom in the Sacramento–Roseville–Arden-Arcade area is $2,201.

Zillow Observed Rent Index (all homes, metro), Aug 2026 · HUD FY2027 2-bedroom Fair Market Rent. ADU for rental income
Long-term rentals

Cities may require ADU rentals of 30 days or more (Gov. Code §66315) — check local short-term rental rules before planning a vacation rental.

Local rent rules

New ADUs are generally exempt from local rent-control caps (Costa-Hawkins); check your city page for local rules.

State rules

A new ADU is exempt from California's statewide rent cap (AB 1482) for 15 years after its certificate of occupancy.

Same money, other options

Yearly income per dollar, before taxes and costs. An ADU wins because you already own the land. Full comparison →

2 Bedroom ADU at HUD 2-bedroom fair rent9.7%
10-year U.S. Treasury5.3%
REIT index fund dividends3.9%
Buying a rental home, Sacramento metro4.8%
12-month CD, U.S. average1.7%

Sources: Civil Code §1947.12; Gov. Code §66315. Comparison: HUD FY2027 2-bedroom Fair Market Rent, Sacramento-Roseville-Arden-Arcade area ($2,201) × 12 ÷ $271,900; U.S. Treasury (Oct 6, 2026); FTSE Nareit (Sep 2026); Zillow ZORI ÷ ZHVI, Sacramento metro (Aug 2026); FDIC (Sep 2026). Not legal or investment advice.

Permits in the Sacramento region

How your ADU permit works — we handle it

01

Free lot check

Zoning, fire & flood maps, setbacks, access, sewer and power for your address.

02

Plans & submittal

Our HCD-approved plans plus your site plan, submitted to your city or county building department.

03

City review

Your city reviews the plans; we answer every correction for you.

04

Decision in 60 days

State law requires a decision on a complete application within 60 days. Your ADU is built in our factory meanwhile.

05

Install & move in

Delivered from our Lathrop factory, about an hour south, and installed in about a week, inspected, then your Certificate of Occupancy.

From lot check to move-in: the ADU permit timelineTIMELINE1Free lot checkno obligation2Plans & submittalwe file for you3City decision≤ 60 days*4Factory buildin parallel5Install & move inabout 1 week

* State law: the city must approve or deny a complete application within 60 days (Gov. Code §66317). Every lot differs.

Based on Gov. Code §66317 and the HCD ADU Handbook (2026). Review times vary by city — see our city pages for local details.

Why now

Start your Sacramento region ADU with zero risk

Lock in launch pricing, see exactly what you get, and only decide once you have a fixed price for your lot.

LAUNCH PRICING · ENDS DEC 31, 2026

All-in from $75,900 — everything included

  • Backyard Studio (home office)$75,900All-in · fixed in writing
  • Small Studio$124,900All-in · fixed in writing
  • Large Studio ADU$154,900All-in · fixed in writing
  • 1 Bedroom ADU$214,900All-in · fixed in writing
  • 2 Bedroom ADU$271,900All-in · fixed in writing
Reserve my launch price

Zero-risk start

  • Free lot check & quoteNo obligation, no credit card.
  • One fixed all-in priceDesign, permits, delivery and install — one number.
  • HCD-approved plansState approval #1585366, financed and appraised like a home.
  • 2-year warrantyOn materials and workmanship.
See it before you buy

Visit our factory in Lathrop, CA and walk through a finished ADU.

Book a factory tour
1We check your lotZoning, fire & flood maps, hydrant access, setbacks, sewer and power for your address.
2You get a fixed priceThe right model for your lot and one all-in number — permits included.
3You decideNo pressure. Lock in launch pricing before December 31, 2026.

Sacramento region ADU questions

See all of California, open your city: Sacramento, or call (209) 214-6845.

How much does a prefab ADU cost in the Sacramento region?

Bay Modular prices are the same anywhere in California: from $75,900 for a Backyard Studio (home office) and $124,900–$271,900 for a rentable ADU, all-in — design, permits and city fees, foundation, delivery, crane, utility hook-ups and final inspection, fixed in writing after a free lot check.

How many ADUs are built in the Sacramento region?

935 ADU permits were reported for 2025 across Sacramento, Placer, El Dorado, Yolo, Sutter and Yuba counties (HCD APR data), up from 526 in 2021. The City of Sacramento issues by far the most.

What does an ADU rent for in the Sacramento region?

Average asking rent was $2,282 in the Sacramento metro in August 2026 (Zillow). HUD's 2027 fair rent for a 2-bedroom in the Sacramento–Roseville–Arden-Arcade area is $2,201.

Can I build two ADUs on my lot?

In the City of Sacramento, yes — the City already allows two ADUs per lot. Statewide, AB 956 lets you build two detached ADUs on a lot with a single-family home from January 1, 2027.

Who issues the permit if I live outside city limits?

In unincorporated areas the county issues the ADU permit, under the same state ADU law.

Do you deliver to the Sacramento region?

Yes — our factory in Lathrop is about an hour south of Sacramento. Send your address for a free lot check.

Free · no obligation

Can you build an ADU on your Sacramento region lot?

Send your address. We'll check zoning, fire and flood maps, access and utilities, and send a price fixed in writing — permits included.

HCD-approved plans (#1585366) · 2-year warranty · factory in Lathrop, CA

Sources: California HCD Annual Progress Report data, Table A2 (Sacramento, Placer, El Dorado, Yolo, Sutter and Yuba counties, 2021–2025, updated Oct 2026); Zillow Observed Rent Index, metro areas (Aug 2026); HUD FY2027 Fair Market Rents; HCD ADU Handbook (2026); Gov. Code §§66311.5–66322; Ed. Code §17620; Civil Code §1947.12; AB 956 (Ch. 791, Stats. 2026). General information, not legal or investment advice. Updated October 2026.

Building in the Sacramento region?Check my lot