Five factory-built models with all-in prices, what can add cost on your lot, and how long it takes from signing to move-in.
A prefab ADU in the Bay Area costs $98,900 to $353,900 all-in on a standard site in 2026, depending on size, and takes about 4 to 6 months from signing to move-in. That one price covers permits, the foundation, delivery, the crane set and utility hookups within 50 feet.
- 5 models, 120 to 640 sq ft, $98,900 to $353,900 all-in.
- Lot add-ons are priced in writing before you sign.
- A $1,000 site study is credited toward your home if you build with us.
What is a prefab ADU? Who builds ours?›
An accessory dwelling unit (ADU) is a second, independent home on a lot with a house, with its own kitchen, bathroom and entrance. A prefab ADU is built indoors in a factory, then set on a permanent foundation in your yard. In California, the legal name for these homes is "factory-built housing," and the state's Department of Housing and Community Development (HCD) oversees them.
Bay Modular, a factory-built ADU company based in Lathrop, California, builds five models in its own factory on California HCD-approved plans (HCD #1585366). Here is what each one costs, what can add to the price, and how long it really takes.
How much does a prefab ADU cost in the Bay Area?
A prefab ADU from Bay Modular costs $98,900 to $353,900 all-in on a standard site, the same price anywhere in California.
| Model | Size | All-in price (standard site) | Per sq ft (our math) | Typical use |
|---|---|---|---|---|
| Backyard Studio | 120 sq ft | $98,900 | about $824 | Home office or studio |
| Small Studio | 256 sq ft | $162,900 | about $636 | Guest suite or small rental |
| Large Studio | 320 sq ft | $201,900 | about $631 | Studio rental or adult child |
| 1 Bedroom | 480 sq ft | $279,900 | about $583 | Parent, caregiver or rental |
| 2 Bedroom | 640 sq ft | $353,900 | about $553 | Larger household or rental |
Cost per sq ft and which model fits›
What changes your number is your lot, not your ZIP code. The bigger the home, the less each square foot costs.
A 480 sq ft prefab 1 Bedroom ADU from Bay Modular costs $279,900 all-in on a standard site in California. Permits, the foundation work and the crane day don't shrink with the house, so per square foot the 2 Bedroom costs about a third less than the Backyard Studio.
Comparing bids? Ask first: is this the price of the home, or of the finished project? A "home only" number grows fast once the foundation, crane and permits arrive as separate bills. Compare every model on all models.
Which model fits your plan? Pick the model by who will live there or what you will do in it, then check that it fits your lot.
- Office or studio: the Backyard Studio, 120 sq ft.
- One person or a long-stay guest: the Small Studio or Large Studio, 256 or 320 sq ft.
- A parent, a caregiver or a long-term renter: the 1 Bedroom, 480 sq ft, with a separate bedroom.
- More people or more space: the 2 Bedroom, 640 sq ft.
An illustration, not a client story: a couple in Fremont wants Mom close, but not in the guest room. A 1 Bedroom gives her a front door, a kitchen and a bedroom of her own, with a yard between the two houses.
A Bay Modular project, July 2021.
What's included, and what adds cost?
On a standard site, the all-in price covers everything from the survey to the final inspection.
Other lots get add-ons, like a long utility run or a slope, priced before you sign.
Everything the price includes›
On a standard site, the all-in price covers:
- Survey, site plan and soils report
- Design, engineering, and city and state permits
- Foundation
- Delivery and crane set
- Utility hookups within 50 feet
- Steps, a short path and the final inspection
A standard site is a lot that is flat or gently sloped, has crane access, has water, sewer and power within 50 feet, is on city sewer, and has nothing to demolish. On a lot like that, the table price is your price.
Anything not on the list, like furniture, landscaping or finish upgrades, should be confirmed in writing before you sign. One more line to ask about: California's Energy Code generally requires solar on a newly built detached ADU, and the panels can go on the ADU or on your main house (HCD ADU Handbook, March 2026). Ask how your project will meet it. Full details are on pricing and financing.
Add-ons and a San Jose estimate›
These are typical market ranges:
| Lot condition | Typical market range |
|---|---|
| Utility run of 50-100 ft | $5,000-$8,000 |
| Bigger crane (tight access or long reach) | $3,000-$8,000 |
| 200-amp electrical panel | $4,500-$7,500 |
| Slope or deeper footings | $5,000-$15,000 |
| Tree removal | about $750 per tree |
| Septic system (no city sewer) | $25,000-$40,000 |
Most add-ons come from three places: pipes that run far, an old panel, and a crane that can't reach. A site study finds them before you sign.
Worked example: a 1 Bedroom in San Jose (estimate). Picture a flat lot in San Jose. The sewer connection is 80 feet from the spot for the ADU, and the house has an older panel that needs a 200-amp upgrade.
- 1 Bedroom, all-in on a standard site: $279,900
- Utility run of 50-100 ft: $5,000-$8,000
- 200-amp panel: $4,500-$7,500
- Estimated total: $289,400-$295,400
For context, HUD's fair market rent for a one-bedroom in the San Jose-Sunnyvale-Santa Clara metro area is $2,778 monthly in FY2027 (HUD Fair Market Rents). That is about $33,300 a year in gross rent, so the estimated total equals roughly 9 years of gross rent, before property tax, insurance, upkeep, vacant months and any loan costs.
Estimate only, not a forecast or a promise of income. HUD's fair market rent is a voucher benchmark, not a market rent. Your rent depends on your property, the local market and local rental rules. Talk to a tax advisor and a lender before you decide. More numbers for this city are in our San Jose ADU page.
How long does a prefab ADU take?
A typical Bay Modular project takes 4 to 6 months from signing to move-in.
By law, your city has 60 days to approve or deny a complete ADU application.
The 5 steps and the 60-day rule›
- Site study and survey. You get a written report and a written list of any add-ons, priced before you sign.
- Design, engineering and permits. We prepare and file the city and state permits.
- Factory build. Your home is built in our factory in Lathrop, California.
- Site work and set. Foundation, delivery, the crane set and utility hookups.
- Finish and inspect. Steps, a short path, the final inspection, and you move in.
The biggest variable is your city's review. Under California Government Code § 66317, a city has 15 business days to tell you whether your ADU application is complete, and 60 days to approve or deny a complete one. If it misses the 60-day deadline, the application is deemed approved (HCD ADU Handbook, March 2026).
Can you build a modular ADU on your lot?
Most can: state law sets a floor that cities can't go below.
A city's size, lot coverage or setback rules can't block an 800 sq ft ADU with 4-foot side and rear setbacks (Gov. Code § 66321).
Three more state rules›
No impact fees at 750 sq ft or less. An ADU of 750 sq ft or less is exempt from impact fees from local agencies, special districts and water companies (Gov. Code § 66311.5). All five of our models qualify.
You don't have to live there. Cities can't require the owner to live on the property for an ADU (Gov. Code § 66315).
Rentals of more than 30 days. Cities may require rental terms longer than 30 days, so plan for monthly renters, not nightly guests.
These rules apply to a prefab ADU anywhere in California. Your city still sets local details, like height and design, so check its ADU page. Source: California Gov. Code § 66317 on leginfo and the HCD ADU Handbook, March 2026.
When is a prefab ADU not worth it?
When your lot needs septic, no crane can reach it, or you can convert space you already have.
Five cases to think twice›
- Your lot needs septic. A $25,000-$40,000 septic system changes the math on any model.
- No crane can reach your yard. A bigger crane helps up to a point. Past that, factory-built won't work.
- You have a garage or spare room to convert. Converting space you already have may cost less than a new building. Price both.
- You need rent to cover the cost fast. In the San Jose example, the price equals about 9 years of gross rent.
- You want a one-of-a-kind design. Factory models are set plans. A custom, site-built project may suit you better.
What should you ask before you sign?
Save these 8 questions and use them with any builder, including us.
The 8 questions, and our answers›
- Is this the price of the home only, or of the finished project through final inspection?
- What counts as a standard site, and does my lot qualify?
- Which add-ons does my lot need, and are they priced in writing before I sign?
- Who files the permits, and who pays the city fees?
- Is the home built on California HCD-approved plans? What is the HCD number?
- What is your contractor license number? (Look it up on the CSLB website.)
- How long from signing to move-in, and what can delay it?
- What does the warranty cover, and for how long?
Our answers: all-in through final inspection, add-ons priced before signing, HCD #1585366, CSLB #1112074, 4 to 6 months, and a 1-year warranty. For a deeper look at fees and site costs, read our California ADU cost guide.
Prefab ADU FAQ
How much does a prefab ADU cost in California?›
A prefab ADU from Bay Modular costs $98,900 to $353,900 all-in on a standard site, and the price is the same anywhere in California. It covers the survey, design, permits, foundation, delivery, crane set, utility hookups within 50 feet and the final inspection. Lots that need extra work get add-ons, priced before you sign.
How long does it take to get a prefab ADU in the Bay Area?›
A typical Bay Modular project takes 4 to 6 months from signing to move-in. That includes the site study, design, permits, the factory build, delivery, the crane set and the final inspection. Your city's review is the biggest variable: state law gives it 60 days to approve or deny a complete application.
Do I pay impact fees on a prefab ADU in California?›
Not if it is 750 sq ft or smaller. California Government Code § 66311.5 exempts these ADUs from impact fees charged by local agencies, special districts and water companies. All five Bay Modular models, from 120 to 640 sq ft, are under that line. Larger ADUs pay fees in proportion to the main house.
What does the $1,000 site study get me?›
The site study is a paid look at your lot before you sign anything. You get a written report that you keep, and any add-ons your lot needs are priced before signing. If you build with Bay Modular, the full $1,000 goes toward your home. If you don't, the report is still yours.
Can I rent out a prefab ADU in the Bay Area?›
Yes, in most cases. California law says a city can't require you to live on the property to have an ADU. Cities may require rentals to be longer than 30 days, so short stays like Airbnb are often not allowed. Check your city's rules, and don't count on a set rent before you price it.
Next: a $1,000 site study with a written report you keep. The full $1,000 goes toward your home if you build with us.
About Julia B. Julia B is a marketing specialist at Bay Modular, a licensed California ADU builder (CSLB #1112074) with its own factory in Lathrop. She writes about what ADUs really cost and how to avoid surprises.
Sources and more guides
More: All models · Pricing and financing · Building in San Jose · How much does an ADU cost in California?
- California HCD, ADU Handbook (March 2026): Gov. Code §§ 66311.5, 66315, 66317, 66321; solar; rental terms
- California Government Code § 66317 (leginfo)
- HUD Fair Market Rents, FY2027, San Jose-Sunnyvale-Santa Clara HUD Metro FMR Area (1-bedroom $2,778)
- CSLB license lookup
Last updated November 25, 2026. Sources checked November 24, 2026. Prices: Bay Modular, November 2026.
General information, not legal, tax, or financial advice. Confirm details for your address with your city's planning department and a lender.
Send this to anyone who thinks an ADU in the Bay Area costs $500,000.